Home / Guide hub / Before commissioning fireplace cabinetry, which documents should you check?

Installation Planning

Before commissioning fireplace cabinetry, which documents should you check?

Confirm the product model and installation requirements before developing the cabinetry. The insert's external dimensions are only one part of the information needed.

Furniture forms still need model-specific planning

TV cabinet and side table collections help you explore the relationship between the fireplace and furniture. Use the specific model’s information to confirm cabinet length, body dimensions, tabletop use, required functions and maintenance access.

FALOART · Published September 23, 2026 · Updated

This is a checklist for early discussions. The actual opening, heat dissipation, electrical, fixing and operating requirements must be confirmed using the selected model's installation documents together with the relevant on-site professionals.

Distinguish Three Types of Dimensions

Dimension TypeWhat to Confirm
External Product DimensionsThe full extent of the unit, trim, projecting components and mounting points.
Installation OpeningThe width, height, depth and fixing method specified in the manufacturer's drawings. These cannot be derived directly from the product's net dimensions.
Operating and Maintenance ClearancesSpace required for heat dissipation, cable routing, door opening, maintenance and removal of the unit.

Documents to Request Before Work Begins

  1. Product information for the confirmed model.The model, configuration, appearance and drawing revision should all match.
  2. Dimension and installation drawings.Include trim, mounting points, the opening and installation steps, with dimensional units clearly stated.
  3. Site coordination requirements.Confirm power supply, ventilation, consumables and other requirements for the specific model.
  4. Cabinetry and finish coordination drawings.Show how the equipment, cabinetry, finishes and edge details fit together.
  5. Maintenance and servicing instructions.Confirm routine maintenance access, components that must be removed and how future replacement will be carried out.
  6. Delivery and acceptance checklist.Define responsibilities for supply, installation, commissioning and on-site coordination.

How should the designer, cabinet supplier and equipment supplier coordinate?

Before ordering cabinetry, all parties should review a shared set of drawings that identifies the product model and revision date. If the model, finish thickness or installation method changes, recheck the affected dimensions and requirements.

Replace “it looks like it will fit” with drawings that can be checked, and record verbal agreements as documents and defined responsibilities. This makes it easier to identify conflicts between the equipment, finishes and maintenance access.

What else is needed for project procurement?

For projects with multiple units, keep an itemized schedule recording installation locations, models, configurations, quantities, drawing revisions and delivery batches. Check the holder, covered models and validity of relevant certificates or test documents, and confirm that they match the models being purchased.

List transport, handling, installation, commissioning, finishing work and after-sales support separately in the quotation request so the scope of delivery can be compared. Record specific commitments in project documents agreed by both parties.

Information to Share at the Start

  • Site photos or interior renderings, plus the proposed installation location.
  • Current elevation and cabinetry drawings, and proposed finish materials.
  • Renovation progress, required quantity and desired delivery date.
  • The preferred product type and whether a specific model has been selected.