Fireplace Selection & Procurement Brief FALOART 法洛塔 | https://faloartfire.com/en/guides/ Use one record per installation location. Record needs and items to confirm, then align the selected model, drawings and procurement documents. Enter “To confirm” for unknown items. Do not fill in parameters from photographs or collection names. Site dimensions are not the installation opening. This brief does not replace model-specific drawings, quotations, procurement agreements or acceptance records. 1. Space Type & Location ID Record the space type and location ID so drawings and quotations can refer to the same position. _______________________________ 2. Flame & Heating Needs State whether the priority is the flame effect, heating or an undecided requirement; describe the desired controls separately. _______________________________ 3. Preferred Collection & Furniture Form Record the preferred collection and a freestanding, side table or TV cabinet direction; use “To confirm” if undecided. _______________________________ 4. Viewing Positions & Viewing Sides Describe the main seat, front or side viewing positions, and the preferred viewing sides. _______________________________ 5. Available Site Dimensions Record the available width, height, depth and units; these are site dimensions, not product dimensions or the installation opening. _______________________________ 6. Preferred Model & Configuration Record the model, finish, decorative log design, controls and accessory requirements; do not infer unknown details from images. _______________________________ 7. Quantity & Planned Batches Record the quantity and preferred delivery batch for each configuration rather than combining different configurations into one total. _______________________________ 8. Project Stage & Target Dates Record the current stage, desired arrival date and expected installation readiness; target dates are not delivery commitments. _______________________________ 9. Operation, Consumables & Maintenance List refilling or consumables, cleaning access, servicing arrangements and site coordination items that need confirmation. _______________________________ 10. Drawing Revisions & Dimension References Record document names, revisions and dates only; identify separate references for overall dimensions, viewing area and installation opening. _______________________________ 11. Quotation Scope & Site Responsibilities Record whether transport, handling, installation, commissioning, finishing and after-sales scope are included; use roles such as equipment supplier, installer and cabinet supplier for responsibility. _______________________________ 12. Handover Documents & Acceptance Checks List the configuration schedule, drawings, instructions and arrival, site and function checks; issue records also need a responsible role, resolution plan and recheck result. _______________________________